Suez or the Cape: what a diversion adds in 2026
Routing a Europe and Asia voyage round the Cape of Good Hope instead of through Suez adds well over a week. In 2026 those days carry fuel, hire and, for the first time at the full rate, EU emission allowances.
What the Cape adds, lane by lane
The distances below come from the router behind our sea distance calculator, for a laden Supramax drawing 12.5 metres at 12.5 knots. The Cape routing closes Panama as well as Suez, so the comparison is with the Cape and not with a canal the ship could not use.
| Lane | Via Suez | Via the Cape | Extra |
|---|---|---|---|
| Rotterdam to Singapore | 8,429 nm | 11,881 nm | +11.5 days |
| Genova to Shanghai | 8,746 nm | 13,704 nm | +16.5 days |
| Piraeus to Singapore | 5,697 nm | 12,267 nm | +21.9 days |
| Antwerpen to Jebel Ali | 6,269 nm | 11,053 nm | +15.9 days |
The closer the load port is to Suez, the more the Cape costs. Piraeus is 2 days from Port Said, so its run to Singapore grows by 115% when it has to go out through Gibraltar and down the length of Africa. Rotterdam is 11.1 days from the canal and its voyage grows by 41%. Antwerp to Jebel Ali grows by 76%, because the Gulf sits just beyond the Red Sea on the Suez route and at the far end of the Indian Ocean on the other.
What the extra days cost
The cost of a diversion is the extra days multiplied by everything that runs by the day. To keep the arithmetic visible we use round, illustrative assumptions rather than a market quote: 26 tonnes of VLSFO a day at sea, VLSFO at USD 560 a tonne, hire of USD 14,000 a day and an EU allowance price of EUR 70.
| Lane | Extra fuel | Fuel | Hire | EU ETS |
|---|---|---|---|---|
| Rotterdam to Singapore | 299 t | USD 167,440 | USD 161,000 | EUR 33,102 |
| Genova to Shanghai | 429 t | USD 240,240 | USD 231,000 | EUR 47,494 |
| Piraeus to Singapore | 569 t | USD 318,640 | USD 306,600 | EUR 62,993 |
| Antwerpen to Jebel Ali | 413 t | USD 231,280 | USD 222,600 | EUR 45,723 |
On Rotterdam to Singapore, the diversion burns about 299 tonnes more fuel, worth USD 167,440, keeps the ship 11.5 days longer at a hire cost of USD 161,000, and adds 473 EU allowances. Replace the assumptions with your own in the EU ETS calculator and the TCE calculator, which takes the extra days directly.
Why 2026 makes the Cape dearer
The EU ETS charges a voyage from an EU port to a port outside the EU on half of everything burnt between the two ports of call. A longer passage therefore carries more allowances, whatever the reason for it. A stop round the Cape only to take bunkers does not count as a port of call, so it does not split the voyage or reduce the share.
2026 is the first year at full strength. Shipping companies surrender allowances for all verified emissions in scope rather than 70%, and methane and nitrous oxide count alongside CO2. The same diversion on Rotterdam to Singapore that would have cost EUR 22,812 in allowances for 2025 costs EUR 33,102 for 2026 at the same price.
What Suez costs instead
The comparison is not complete without the Suez side, and those figures depend on the ship and the day rather than on distance. The canal toll is charged on the vessel's Suez Canal net tonnage, type and laden state, under the Suez Canal Authority's published rates and any rebates in force. Transits of the Red Sea and Gulf of Aden can carry an additional war risk insurance premium, crew allowances and waiting time at the canal.
The decision is a trade between those amounts and the table above, plus one thing no table prices: whether the cargo still arrives inside the window the buyer will accept. A diversion that saves money but misses the receiver's laycan has not saved anything.
Who pays for the longer route
On a time charter, the charterer pays hire and bunkers while the vessel follows its orders, so the cost of a Cape routing it chooses is its own. Where the owner relies on the war risks clause to refuse a Red Sea passage, the charterer gives alternative orders and, in the ordinary case, pays for them. The clause decides when the owner may refuse and who pays any extra insurance.
On a voyage charter the freight is fixed, so extra days fall on the owner unless the recap or the war risks clause gives it extra freight for a longer route. The EU allowances follow whichever BIMCO clause the fixture uses. Under the freight clause they sit inside the agreed freight, so the owner absorbs a diversion. Under the transfer of allowances clause the charterer provides allowances for the actual emissions, trued up after the voyage, and so pays for the longer passage too. Under the surcharge clause the amount is the one agreed, so check whether it was set on the Suez routing. That difference is worth settling before fixing, not after the vessel turns south.
Primary sources and editorial scope
The links below are the primary references used for this guide. Poseidon's text is its own explanation of general market practice. Licensed form wording remains with its publisher, and the signed fixture governs every live transaction.
- Eurostat SeaRoute and the MARNET network The open maritime network our router uses. Our accuracy checks against published distance tables are described on the sea distance calculator.
- EU ETS Directive 2003/87/EC, consolidated The 50% coverage of voyages into or out of the EU, the 2026 phase-in and the gases counted.
- MRV Regulation (EU) 2015/757, consolidated The default emission factors behind the allowance figures, and the definition of a port of call.
Common questions
How many extra days does the Cape of Good Hope add between Europe and Asia?
On the four lanes measured here, between 11.5 and 21.9 days at 12.5 knots for a laden Supramax. Rotterdam to Singapore grows from 8,429 to 11,881 nautical miles, about 11.5 days more. Mediterranean ports lose more than North European ones, because Suez is on their doorstep.
Does a Cape diversion increase EU ETS costs?
Yes. For a voyage from an EU port to a port outside the EU, half of all emissions between the two ports of call are in scope, so every extra tonne of fuel burnt rounding the Cape adds allowances. From 2026 the phase-in is 100% and methane and nitrous oxide count, so the same diversion costs more allowances than it did in 2025.
Is a bunker stop on the way round the Cape a port of call under the EU ETS?
No. A stop only to take bunkers, supplies or crew, for repairs or for shelter is not a port of call, so it does not split the voyage. The passage is measured from the last port where cargo was loaded or discharged to the next one.
Who pays for the longer route on a time charter?
The charterer, in the ordinary case. It pays hire and bunkers for the time the vessel follows its orders. Where the owner relies on a war risks clause to refuse a Red Sea routing, the charterer’s alternative orders, and their cost, are usually the charterer’s. The clause wording decides the detail.
This guide describes general market practice and is not legal advice. The signed contract, charter party and transaction-specific advice take precedence.